High energy

High energy

  • The Strom-Boje delivers day and night – 8750 hours up to 300 MWh per year,
  • low-cost and grid-compliant base load, at any water level,
  • and as the only power plant also at high water.
  • Therefore, it does not need a so-called compensating power plant.
  • no high-voltage power lines
  • it delivers 400V/50Hz to the end user or via a transformer to the medium voltage grid
  • is therefore ideal for the local and regional supply of up to 100 households.
  • after all, almost all people live near rivers.

Deliberately robust, therefore long service life and low maintenance requirements

  • at least 25 years or 210,000 operating hours,
  • The only mechanical wear parts are 2 shaft bearings with 80,000 operating hours, which   have to be replaced in between.
  • Short pipe runs and optimum cooling in the water improve the efficiency,
  • In the event of a malfunction, the entire box is replaced within a short time.

Comments are closed